Chapter 1: Calibration and Debugging – Calibrate the Rubon 3-in-1 camera.

Chapter 1: Calibration and Debugging

Calibrate the Rubon 3-in-1 camera.

Step - 1

1. Open the body software and locate the Rubon 3-in-1 camera, then click to copy the camera’s serial number.

2. Open the workstation design in the special machine software, set the 3D camera brand to Shenzhen Rubon X, and paste the copied serial number into the name field.

Step - 2

1. Make sure to set the virtual reference Z value according to the actual site conditions and the length of the welding torch. It is generally recommended to set it to 550 or 600 (standard torch neck length). The XYZ direction order should be -1, 1, -1. The installation angle should be verified and filled in based on the actual on-site installation.

2. After completing the input, click the Save button to save the changes and exit the workstation design page.

Step - 3

Click on “Profile Steel Parameters” under the auxiliary list. In the composite vision section, set the camera brand to Rubon Swing Line Scan, enter the camera serial number as the camera name, and then click OK.

Step - 4

Click the “3D Calibration” button under the 3D page to enter the 3D automatic calibration page.

Step - 5

Click “Start Online” and then “Start Camera” in sequence at the bottom of the page.

Step - 6

Place the calibration square plate directly below the robot camera. Note that the point recording order follows the current PCS perspective: bottom right is the first point, top right is the second point, bottom left is the third point, and the center point is the fourth point.

Step - 7

Use the teach pendant to teach the points one by one in the order specified in the previous step. After completing the teaching, save the settings.

Step - 8

Click the “Upload Plate Values” button in the dropdown menu. The program will display the points recorded by the teach pendant and sequentially replace Calibration Point 1, Calibration Point 2, Calibration Point 3, and the Center Point.

Step - 9

Move the camera upward to be directly above the calibration plate, then click “Auto Leveling.” The camera will automatically capture and calculate. After the calculation prompt appears, check whether the F1P4 calibration on the calibration plate and the suggested rotation angle are normal. If they are normal, click “Yes” until the “Leveling Completed” prompt appears.

Step - 10

After leveling is completed, click the “Auto Centering” button. Similarly, observe the F1P4 calibration on the calibration plate below and the suggested movement offset. If everything appears normal, click “Yes” and repeat the process until the “Centering Completed” prompt appears.

Step - 11

After leveling and centering are completed, switch the tool to tool9 and click the “Upload Tool Values” button under the upload list.

Step - 12

After confirming the upload, the currently calculated tool values will pop up. Click the “Yes” button to transfer these values into the controller. The camera calibration is now complete

Calibrate the Rubon 3-in-1 camera.

Step - 1

After calibration is completed, use the structural component shown in the figure, and use tool1 to move the welding torch to align with the intersection point of the three surfaces of the structure (ensure that the torch posture is as centered as possible within the structure).

Step - 2

1. Connect the software online, ensuring that the current tool number is set to 1.

2. Click the “Record Verification Point” button on the operation page. The coordinates should now appear in the verification point list below.

Step - 3

Raise the welding torch to a safe position, then switch to tool9 in the position control panel, enter the verification point coordinates, and send the data.

Step - 4

After leveling is completed, click the “Auto Centering” button. Similarly, observe the F1P4 calibration on the calibration plate below and the suggested movement offset. If everything appears normal, click “Yes” and repeat the process until the “Centering Completed” prompt appears.

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Cover for JTC Laser
JTC Laser

JTC Laser

913,613 Likes

Intelligent robot workstations, intelligent work islands, providing the entire process (cutting, assembly, welding, grinding, inspection, etc.) of intelligent applications for the non-standard metal structure manufacturing industry.

The biggest characteristic of the machinery industry is the wide variety of products and custom parts. This requires true flexible production, because every factory welds different products, and one product may be very different from another.

Traditional robot welding can be difficult to promote in this industry because welding paths usually cannot be reused, and there are often many different products to handle. For many manufacturers, programming and teaching are required for the whole process, which greatly increases the barrier to using robots.

Our solution is a robot smart welding factory based on 3D vision and an intelligent welding system. The vision system takes photos and scans the workpiece, generates a real-time point cloud model, and the intelligent system automatically extracts the weld path from the data. The operator only needs to place the workpiece in front of the robot and click start.

The system can recognize the component, generate the welding path, and complete the welding operation without importing a 3D model or performing complex teaching operations. It greatly lowers the barrier to using robotic welding and makes automation easier for factories producing many different kinds of workpieces.

This is especially suitable for high-mix, low-volume production, non-standard parts, and manufacturers that need flexible welding automation.
See MoreSee Less

1 week ago

Four sets of 12-meter ground rails and one 9-axis cantilever intelligent welding workstation are being installed, set to boost manufacturing upgrading at CRCC High-Tech Equipment Co., Ltd. in Kunming, Yunnan. See MoreSee Less

1 week ago

1 CommentComment on Facebook

Me interesa

Four 12-meter ground-rail intelligent welding workstations and one nine-axis cantilever intelligent welding workstation will soon support the manufacturing upgrade of CRCC High-Tech Equipment Corporation Limited in Kunming, Yunnan. Equipment installation is now in progress. See MoreSee Less

1 week ago

Repeat order from an old customer 💪
Intelligent welding helps drive the smart upgrade of the packaging machinery industry.
See MoreSee Less

1 week ago
Load more

Latest News

Contact Details

Subscribe Us

Join our newsletter; you will receive our newest videos/tips of our laser marking, cutting, welding, cleaning and cladding machine’s latest prices and the latest promotional news


You will also get our monthly report of best products, and also coupons.

Inquire Now

Feel free to inquire now. We are always here to help you.

¡Consulta ahora!

Siéntase libre de hacer su consulta ahora. Siempre estamos aquí para ayudarlo.

استفسر الآن

لا تتردد في الاستفسار الآن. نحن دائمًا هنا لمساعدتك.

Связаться сейчас

Не стесняйтесь задавать вопросы. Мы всегда готовы помочь вам.